TOWER DRILL

Practice ATC before your next flight lesson.

Simulated ATC practice for student pilots

Hear a simulated controller, answer out loud, and get focused feedback before your next flight lesson.

  • 5 lessons free
  • 577 US practice airports
  • $8.99 one-time purchase

Why spoken practice helps

The hard part is answering in real time.

Reading phraseology is useful. Saying a complete readback while details are still arriving is a different skill. Tower Drill gives you a quiet place to practice that exact moment.

01

Listen

Get used to the cadence.

Controller-style voices and radio filtering help you separate a quick instruction into useful pieces.

02

Respond

Say the whole readback.

Hold push-to-talk and answer in your own voice. You are practicing recall, not recognizing words on a screen.

03

Repeat

Correct one detail at a time.

See the runway, frequency, squawk, or instruction you missed, then take the call again while it is fresh.

A ten-minute session

One call at a time, with room to try it again.

Calls use FAA-style phraseology and changing details. Nothing is broadcast, and speech recognition stays on your device.

1

Listen for your callsign

A simulated ground, tower, approach, or center controller gives you a realistic instruction.

2

Press, hold, and answer

Make the readback in your own voice. Choose full coaching, a few prompts, or no hints.

3

Check the important items

Review what the app heard, replay your transmission, and repeat the call when something was missed.

Choose the right kind of rep

Use the amount of help you need today.

Open the Field Guide
NO SCORE

Listen & Shadow

Hear an example and repeat it without a grade. A good starting point when the microphone still feels awkward.

GUIDED

Training & Coached

Begin with the expected response on screen, then reduce the prompts as the call becomes familiar.

NO HINTS

Solo Practice

Answer changing ATC instructions without seeing the response first.

REVIEW

Tape Review

Replay a saved transmission, read the transcript, and compare it with the expected response.

FOCUSED

Practice My Misses

Build a short session from the calls and radio items that gave you trouble.

TAXI

Taxi Trainer

Put a taxi route in order and identify every runway crossing and hold-short instruction.

Tower Drill US practice airport picker

Your home airport

Practice with the names and numbers you expect to hear.

Choose from 577 US towered airports. Scenarios use FAA-derived runway and frequency references for the field you select, including its approach facility.

  • Use your own tail number and aircraft type with Pro
  • Randomized calls prevent memorizing one script
  • Training reference data is bundled for practice

Airport values are training references, not live operational data. Verify every value with current official sources before flight.

Flight Day

Do the briefing, then rehearse the radio work.

Flight Day points you to current airport sources, then turns the operation you choose into a simulated radio sequence. The source information and the rehearsal are clearly labeled.

Read the Flight Day tutorial
CURRENT / OFFICIAL

Briefing information

Latest available Aviation Weather Center METAR, plus in-app links to Aviation Weather, FAA NOTAM Search, Chart Supplement Search, and the airport diagram.

SIMULATED PRACTICE

Controller calls and clearances

Tower Drill generates the ATC conversation for rehearsal. It is not connected to a real controller and never provides an operational clearance.

Start with five free lessons

Get the full course for one payment.

The first five lessons are free. A one-time $8.99 purchase includes the complete course, 577 practice airports, and the advanced practice tools.

$05 beginner lessons
24 spoken drills
$8.99Pro, paid once
Full course and 577 airports
Download on the App Store

A few good reps can change the start of a lesson.

Practice privately until hearing your tail number feels familiar.

Try Tower Drill Free